Home / Inventory & replenishment
Find the few items that hold most inventory value and which have erratic demand, so control effort goes where it matters and the rest is simplified.
Pre-sizing and estimating tool: results do not replace design, calculations or reports signed by a licensed professional, nor verification against the applicable codes and standards.
Items from highest to lowest annual value, with cumulative percentage. Colors show the class.
The report gathers this page's inputs, results, equations, assumptions and references, with fields for project, engineer and revision. In the print dialog, choose Save as PDF.
Multiply each item’s annual usage by unit cost, sort from highest to lowest value and compute the cumulative percentage. Items up to 80% of value are A, up to 95% are B, the rest are C.
To separate steady items from erratic ones. Combined with ABC, it shows where to use automatic replenishment (AX), where to calculate safety stock (AY, BY) and where to buy only on demand (AZ, CZ).
No. They are common references. Some companies use 70/90 or classify by item count. What matters is reviewing the classification regularly.
Important notice: Indus Metrics tools produce estimates and pre-sizing results from the data you enter and from published engineering methods. They do not replace design, calculations or reports signed by a licensed professional engineer (PE), nor verification against the applicable codes, standards and regulations, such as OSHA rules and the ASME codes. Material and fuel properties vary: check manufacturer data or your own process analyses before deciding. By using this site you agree to the Terms of Use.
© 2026 Indus Metrics. Found an error? Write to contato@seudominio.com.