Enter compressor capacity, pressure band and demand peaks to get the receiver volume that limits cycling and keeps minimum plant pressure.
Pre-sizing and estimating tool: results do not replace design, calculations or reports signed by a licensed professional, nor verification against the applicable codes and standards.
A narrower band needs more volume for the same number of cycles.
Pressure decay in the chosen receiver while demand exceeds the compressor.
The report gathers this page's inputs, results, equations, assumptions and references, with fields for project, engineer and revision. In the print dialog, choose Save as PDF.
It depends on compressor capacity, pressure band and allowed cycles per hour. A common rule for load/unload compressors is 1 to 2 gallons per cfm; poorly controlled systems may need 3 to 5.
It does when it eliminates short cycling and lets the system run at a lower average pressure, and when it covers peaks without starting another compressor. Beyond what is needed, gains are small.
Receivers are pressure vessels: ASME Section VIII construction and state jurisdiction rules, plus OSHA 1910.169 (drain, gauge and safety valve).
Important notice: Indus Metrics tools produce estimates and pre-sizing results from the data you enter and from published engineering methods. They do not replace design, calculations or reports signed by a licensed professional engineer (PE), nor verification against the applicable codes, standards and regulations, such as OSHA rules and the ASME codes. Material and fuel properties vary: check manufacturer data or your own process analyses before deciding. By using this site you agree to the Terms of Use.