Home / Reliability & management
Enter the component’s Weibull life and the costs of a planned replacement and an in-service failure to find the interval with the lowest cost per hour and the savings over current practice.
Pre-sizing and estimating tool: results do not replace design, calculations or reports signed by a licensed professional, nor verification against the applicable codes and standards.
Short intervals waste parts; long ones let units fail. The dashed line is run-to-failure.
Cost per hour split between planned replacements and in-service failures.
The report gathers this page's inputs, results, equations, assumptions and references, with fields for project, engineer and revision. In the print dialog, choose Save as PDF.
Use the cost per hour of an age replacement policy: add the cost of planned replacements and of failures that still happen and divide by the mean time in use. The interval with the lowest value is optimal.
Because failure risk does not grow with age. Replacing a used part with a new one does not lower the chance of failure and can introduce assembly errors.
No. The bottom of the curve is usually wide, so replacements can be aligned with planned shutdowns at little cost.
Important notice: Indus Metrics tools produce estimates and pre-sizing results from the data you enter and from published engineering methods. They do not replace design, calculations or reports signed by a licensed professional engineer (PE), nor verification against the applicable codes, standards and regulations, such as OSHA rules and the ASME codes. Material and fuel properties vary: check manufacturer data or your own process analyses before deciding. By using this site you agree to the Terms of Use.
© 2026 Indus Metrics. Found an error? Write to contato@seudominio.com.