Enter the backlog, weekly incoming work and the crew to see backlog in weeks, how it evolves and how many technicians you need, along with the main maintenance KPIs.
Pre-sizing and estimating tool: results do not replace design, calculations or reports signed by a licensed professional, nor verification against the applicable codes and standards.
Backlog in weeks with the current crew and the recommended crew; the green band runs from 2 to 4 weeks.
References from maintenance planning literature; adjust to your industry.
The report gathers this page's inputs, results, equations, assumptions and references, with fields for project, engineer and revision. In the print dialog, choose Save as PDF.
Add the labor hours of approved work orders not yet done and divide by weekly capacity: technicians × weekly hours × (1 − absence) × wrench time.
Two to four weeks is the usual range. Below two, the crew tends to be idle or work is not being recorded; above four, jobs get late and turn into emergencies.
No. Raising wrench time from 35% to 50% through planning is equivalent to growing the crew by more than 40%, without new hires.
Important notice: Indus Metrics tools produce estimates and pre-sizing results from the data you enter and from published engineering methods. They do not replace design, calculations or reports signed by a licensed professional engineer (PE), nor verification against the applicable codes, standards and regulations, such as OSHA rules and the ASME codes. Material and fuel properties vary: check manufacturer data or your own process analyses before deciding. By using this site you agree to the Terms of Use.