Home / Inventory & replenishment
Enter average usage and its variation, supplier lead time and its variation and the target service level to get safety stock, reorder point, holding cost and a verification simulation.
Pre-sizing and estimating tool: results do not replace design, calculations or reports signed by a licensed professional, nor verification against the applicable codes and standards.
Each extra point of service level costs more stock; near 100% the curve shoots up.
On-hand stock with random usage and lead times generated from the means and deviations entered.
The report gathers this page's inputs, results, equations, assumptions and references, with fields for project, engineer and revision. In the print dialog, choose Save as PDF.
With average usage of 120 units/day (std. dev. 35), a 12-day lead time (std. dev. 3) and a 95% service level, safety stock is 1.645 × √(12 × 35² + 120² × 3²) ≈ 625 units.
Safety stock covers variation. The reorder point is the level at which you order: average usage during the lead time plus safety stock.
Because each extra day of delay consumes a full day of average demand. With high usage, a few days of lead time variation need more stock than daily demand variation.
Important notice: Indus Metrics tools produce estimates and pre-sizing results from the data you enter and from published engineering methods. They do not replace design, calculations or reports signed by a licensed professional engineer (PE), nor verification against the applicable codes, standards and regulations, such as OSHA rules and the ASME codes. Material and fuel properties vary: check manufacturer data or your own process analyses before deciding. By using this site you agree to the Terms of Use.