Investment appraisal with income statement, NPV and IRR, machine hour cost, break-even, make or buy, equipment buy vs. lease and working capital.
Calculate a machine hour rate with depreciation, interest on capital, energy, maintenance, floor space, insurance, overhead and operator, and the cost per good part from cycle time and OEE.
Fixed, variable, per partCompute the break-even point of a product mix, contribution margin and profit, and find the most profitable mix when a bottleneck machine limits output.
CM, optimal mix, bottleneckCompare making in-house with buying from a supplier on incremental cost, see the volume above which making pays and the NPV, IRR and payback of the investment.
Incremental cost, break-even, NPVCompare buying with cash, financing, renting and leasing a machine or vehicle on present value cost, with resale, maintenance and tax shields.
Loan, lease, rent, taxCompute the operating and cash conversion cycles from inventory, collection and payment days, the working capital requirement, its funding cost and the cash freed by shortening the cycle.
DIO, DSO, DPOBuild the cash flow and income statement of an industrial project, with ramp-up, working capital, MACRS or bonus depreciation, federal and state tax and financing, and get NPV, IRR, payback and sensitivity.
Cash flow, P&L, NPV, IRR, loanImportant notice: Indus Metrics tools produce estimates and pre-sizing results from the data you enter and from published engineering methods. They do not replace design, calculations or reports signed by a licensed professional engineer (PE), nor verification against the applicable codes, standards and regulations, such as OSHA rules and the ASME codes. Material and fuel properties vary: check manufacturer data or your own process analyses before deciding. By using this site you agree to the Terms of Use.
© 2026 Indus Metrics. Found an error? Write to contato@seudominio.com.