Fiber optics, structured cabling, conduit and cable tray fill, PoE, CCTV, point-to-point radio and equipment rooms.
Compute free-space path loss, 1st Fresnel zone radius, Earth bulge with k = 4/3, minimum tower height for 60% clearance, received level, fade margin and link availability.
Fresnel, towers, marginPaste your equipment list to get rack units and the number of 42U or 44U racks, power per rack, heat load in Btu/h and tons, N+1 cooling, current and UPS size in kVA.
U, kW, Btu/h, tons, kVACompute the loss of a single-mode or multimode fiber link with connectors, splices and splitters, the received power, margin and maximum reach, including GPON classes B+ and C+ from ITU-T G.984.2.
Loss, margin, reach, GPONCompute conduit fill with NEC Chapter 9 limits, find the smallest EMT, RMC or PVC Schedule 40 trade size that complies and check cable tray fill for network and signal cables under NEC 392.22.
53/31/40%, EMT, RMC, trayEstimate structured cabling for a floor per TIA-568 and ISO/IEC 11801: drops per work area, average run length, 1000 ft boxes with end waste, patch panels, cords, switches and rack height, with a warning for runs over 90 m (295 ft).
Drops, cable, patch panels, rackCompute storage for an IP CCTV system from each camera group’s resolution, fps, H.264/H.265 codec, quality and recording time: TB for the retention period, RAID drives, recorders and switch uplink bandwidth.
TB, drives, RAID, Mbit/sAdd up PoE ports by class (802.3af, at and bt Types 3 and 4), compute Cat5e or Cat6 cable loss and current, required switch power with margin, spare power and the UPS needed.
Classes, cable loss, spareImportant notice: Indus Metrics tools produce estimates and pre-sizing results from the data you enter and from published engineering methods. They do not replace design, calculations or reports signed by a licensed professional engineer (PE), nor verification against the applicable codes, standards and regulations, such as OSHA rules and the ASME codes. Material and fuel properties vary: check manufacturer data or your own process analyses before deciding. By using this site you agree to the Terms of Use.
© 2026 Indus Metrics. Found an error? Write to contato@seudominio.com.