Home / Instrumentation & automation
Paste the PV response to a step in controller output, or enter K, τ and θ, to get controller settings from three rules and see how each responds to a setpoint change.
Pre-sizing and estimating tool: results do not replace design, calculations or reports signed by a licensed professional, nor verification against the applicable codes and standards.
Points: measured PV. Lines: first-order-plus-dead-time models from both fitting methods.
Closed loop on the process model, for the three rules with the chosen controller. Derivative on PV with filter (N = 10), no output limits.
Ideal (ISA) form: Kc, Ti, Td. Parallel form: Kp, Ki, Kd. Proportional band = 100 ÷ Kc.
Take this page’s results to another calculator with the fields already filled in.
The report gathers this page's inputs, results, equations, assumptions and references, with fields for project, engineer and revision. In the print dialog, choose Save as PDF.
With the controller in manual, step the output 5% to 10% and record PV until it settles. Fit the model (K, τ, θ) from the 28.3% and 63.2% points and apply a rule. In the example, K ≈ 1.6 %/%, τ ≈ 42.5 s and θ ≈ 20.6 s give a lambda PI (λ = τ) with Kc ≈ 0.42 and Ti ≈ 42.5 s.
Ziegler-Nichols aims for a fast quarter-decay response, accepting 20% to 60% overshoot. Lambda with λ = τ gives a robust response with no overshoot; it is preferred for flow, level and temperature in continuous processes.
In the ideal (ISA) form, Kc multiplies all three terms and Ti, Td are times. In the parallel form the gains are independent: Ki = Kc ÷ Ti and Kd = Kc · Td. With Kc = 0.42 and Ti = 42.5 s, Ki ≈ 0.0099 1/s.
On slow, low-noise processes such as temperature, with significant dead time. On liquid flow and pressure, measurement noise makes D harmful: use PI.
Important notice: Indus Metrics tools produce estimates and pre-sizing results from the data you enter and from published engineering methods. They do not replace design, calculations or reports signed by a licensed professional engineer (PE), nor verification against the applicable codes, standards and regulations, such as OSHA rules and the ASME codes. Material and fuel properties vary: check manufacturer data or your own process analyses before deciding. By using this site you agree to the Terms of Use.
© 2026 Indus Metrics. Found an error? Write to contato@seudominio.com.