Enter load, inverter efficiency and battery bank to see how long the UPS holds up and how many Ah you need for the target backup time, with temperature and aging included.
Pre-sizing and estimating tool: results do not replace design, calculations or reports signed by a licensed professional, nor verification against the applicable codes and standards.
Time to end voltage with the bank entered, new and at end of life (with the aging factor). The dot is the current load.
Ah of each battery for the current load, with temperature, end voltage and aging. The dashed line is the chosen battery.
The report gathers this page's inputs, results, equations, assumptions and references, with fields for project, engineer and revision. In the print dialog, choose Save as PDF.
With 94% efficiency and a Peukert exponent of 1.15, about 93 minutes with new batteries and 72 minutes at end of life, at 77 °F and 1.75 V per cell.
Because Ah capacity is rated over 20 h. In a 1 h discharge, a 100 Ah C20 battery delivers only about 60 to 70 Ah. The Peukert exponent corrects for that.
At 59 °F (15 °C), capacity drops about 10% on 1 h discharges. IEEE 485 sizes for the lowest expected room temperature.
Batteries are replaced at 80% of rated capacity. Sizing with 1.25 keeps the required runtime until the last day before replacement.
Important notice: Indus Metrics tools produce estimates and pre-sizing results from the data you enter and from published engineering methods. They do not replace design, calculations or reports signed by a licensed professional engineer (PE), nor verification against the applicable codes, standards and regulations, such as OSHA rules and the ASME codes. Material and fuel properties vary: check manufacturer data or your own process analyses before deciding. By using this site you agree to the Terms of Use.