Enter the tanks, pads and available area to see the volume the dike must hold under the chosen rule, how much the other tanks take up, the wall height with rain and freeboard and whether it stays within the limit.
Pre-sizing and estimating tool: results do not replace design, calculations or reports signed by a licensed professional, nor verification against the applicable codes and standards.
Volume the dike holds at each height, after deducting the other tanks and the pads, compared with the volume the rule requires.
Gross volume up to the top of the wall, split between the liquid to contain, rain, occupied space and freeboard.
The calculation report gathers this page's inputs, results, equations, assumptions and references, with fields for project, engineer and revision. The full report also includes the charts and interpretations, in color. In the print dialog, choose Save as PDF.
It is a walled area around aboveground tanks of flammable or combustible liquids that holds the product if a tank leaks or fails. NFPA 30, as adopted by the local fire code, requires diking or remote impounding, and the EPA SPCC rule (40 CFR 112) requires secondary containment for oil storage above its thresholds. It keeps product out of storm drains, waterways and the rest of the site.
NFPA 30 requires at least the full contents of the largest tank, after deducting the volume the other tanks occupy below the dike height. The SPCC rule adds sufficient freeboard for precipitation. In the example, the 250,000 gal tank plus 40,395 gal of rain from a 6 in storm requires 290,395 gal of net capacity.
Not always. Industry often uses 110% of the largest tank as a rule of thumb, but EPA notes it may not cover larger storms and its examples use the 25-year, 24-hour storm. In the example, 110% gives 275,000 gal, less than the 290,395 gal needed with 6 in of rain over the 10,800 ft² dike.
In the example the liquid rises to 4.11 ft in a 120 × 90 ft dike, under the 6 ft average interior height allowed by NFPA 30. The other tanks and pads take up 41,782 gal and force the wall about 0.3 ft higher. The page also gives the minimum area to stay within 6 ft: 7,429 ft² here.
Besides volume: the dike floor slopes to drainage, the drain valve stays closed and is opened only after checking the water, the outside base is at least 10 ft from property lines that can be built on, and dikes with two or more tanks are subdivided by channels or intermediate dikes at least 18 in high. SPCC also requires inspection and records.
No. It is a pre-sizing and volume check for vertical tanks with vertical walls. The containment design needs a licensed engineer and approval by the authority having jurisdiction; SPCC plans above the qualified facility thresholds must be certified by a PE.
Important notice: Indus Metrics tools produce estimates and pre-sizing results from the data you enter and from published engineering methods. They do not replace design, calculations or reports signed by a licensed professional engineer (PE), nor verification against the applicable codes, standards and regulations, such as OSHA rules and the ASME codes. Material and fuel properties vary: check manufacturer data or your own process analyses before deciding. By using this site you agree to the Terms of Use.