Home / Precast concrete

Precast concrete cost per piece

Enter the mix with prices, piece dimensions, reinforcement and form to find what each piece costs, what to sell it for and how much the forms turn out per day.

Pre-sizing and estimating tool: results do not replace design, calculations or reports signed by a licensed professional, nor verification against the applicable codes and standards.

Preliminary estimate
Concrete mix (per cubic yard)
Piece
Reinforcement, form and labor
Production
Pricing
—Selling price per piece
—

Cost breakdown per piece

Each share of the direct cost of one piece, before taxes, overhead and margin.

Tap the chart to see the values.

Concrete cost per cubic yard

How much each mix ingredient adds to the cost of 1 yd³ of concrete.

Tap the chart to see the values.

The calculation report gathers this page's inputs, results, equations, assumptions and references, with fields for project, engineer and revision. The full report also includes the charts and interpretations, in color. In the print dialog, choose Save as PDF.

Method, assumptions and references

Equations used

Concrete per yd³ = cement · price + sand · price + stone · price + water · price + admixture · price; w/c = water ÷ cement
Volume: pipe π/4 · [(Di + 2t)² − Di²] · L; prism L · W · H; curb (b + t)/2 · h · L; pole π · L/12 · (Db² + Db·Dt + Dt²), minus the core if hollow
Cost per piece = volume · (1 + waste) · concrete per yd³ + steel · price + form ÷ uses + release agent + curing + hours · rate
Price = cost ÷ [1 − (taxes + overhead + margin)]; pieces per form per day = 24 ÷ cycle (h)

Assumptions and limits

  • Volumes from simple geometry: pipe bells and joints, holes, chamfers and blockouts are excluded; use waste or the entered volume to correct. Piece weight uses the mix unit weight plus steel.
  • Plant-wide energy, equipment maintenance, QC testing, yard storage, delivery, erection and crane depreciation are excluded; include them in the labor rate or overhead.
  • Output assumes the form cycle runs around the clock; shifts, holidays and downtime reduce it. The mix needs a mix design and strength tests.

Standards and technical documents

  • ABNT NBR 9062:2017 Projeto e execução de estruturas de concreto pré-moldado
  • ABNT NBR 12655:2022 Concreto de cimento Portland — Preparo, controle, recebimento e aceitação — Procedimento
  • ABNT NBR 6118:2023 Projeto de estruturas de concreto (classes de agressividade e relação água/cimento)
  • ACI 211.1-91 (Reapproved 2009) Standard Practice for Selecting Proportions for Normal, Heavyweight, and Mass Concrete
  • PCI Design Handbook: Precast and Prestressed Concrete, 8th ed. (MNL-120), Precast/Prestressed Concrete Institute, 2017

U.S. regulations

  • OSHA 29 CFR 1926 Subpart Q: Concrete and Masonry Construction (1926.704, precast concrete)
  • OSHA 29 CFR 1910.179: Overhead and gantry cranes (plant handling)

Frequently asked questions

What does this calculator do?

It works out what a precast concrete piece costs to make (pipe, panel, slab, curb, pole or a piece of known volume) and what to sell it for. It starts from the mix per cubic yard with material prices, computes the piece volume, adds reinforcement, form, release agent, curing and labor, then applies overhead and margin. It also shows price per cubic yard and per ton and how many pieces the forms turn out per day.

Where do I get the mix per cubic yard?

From the mix design by your lab or ready-mix supplier, which sets quantities for the required strength and durability (ACI 211.1 proportioning). If the plant batches by volume, convert to weight per cubic yard with each material’s unit weight. The weights should add up to roughly 3,950 to 4,100 lb/yd³; if not, the mix is probably not per cubic yard.

How do I read the example result?

The example is a 24 in reinforced pipe with a 3 in wall and 8 ft laying length: 14.1 ft³ of concrete and 2,117 lb. Concrete costs $84.12/yd³, so the piece takes $46.25 of concrete (with 5% waste), $18 of rebar, $6 of form and $24 of labor, plus curing and release agent. Direct cost is $95.45 and price $127.26, or $243 per cubic yard and $120 per short ton.

Why does cement weigh so much in the cost?

Because it is the costliest ingredient: in the example, 564 lb of cement make up half the concrete cost. That is why small mix tweaks, such as a water reducer to cut water and cement while keeping the water-cement ratio, pay more than haggling over sand and stone. Any mix change needs new strength tests (ASTM C39 cylinders) before production.

How does the form show up in cost?

The form price is divided by the number of uses it lasts before rework or scrapping. In the example a $9,000 form good for 1,500 uses costs $6 per piece; with 4 forms on a 24 h cycle the plant makes 4 pieces a day, 88 a month, and each form lasts about 5.7 years. Wood forms, with a few dozen uses, weigh much more per piece.

What does the calculator leave out?

Plant-wide energy, equipment maintenance, QC testing, yard storage, delivery, erection and crane depreciation are not included: put them in the labor rate or overhead. Volumes come from simple formulas and ignore bells, joints and blockouts. The calculator does not check the structural design of the piece, which follows the PCI Design Handbook, ACI 318 and the project specs.

How much does it cost to make a concrete pipe?

It depends on the mix, the steel and local material prices, but the math is always the same: concrete in the piece, rebar, form share, curing and labor. In the example, a 24 in by 8 ft reinforced pipe costs about $95 to make and $127 to sell with 25% overhead and margin. Replace the fields with your prices and your plant’s mix to get your own figure.