Home / Lean Six Sigma / Work measurement & methods
Check the job conditions (posture, weight, environment, attention and monotony) to get the total allowance, the standard time and the reason for each item, ready to attach to the time study.
Pre-sizing and estimating tool: results do not replace design, calculations or reports signed by a licensed professional, nor verification against the applicable codes and standards.
Percentage of each item on normal time, largest first. Grey: constant; colored: job-dependent variable allowances.
Minutes of the working shift at 100% of standard: producing at normal time and on allowances.
Each table item, the condition chosen and the allowance. Print it to attach to the time study.
Take this page’s results to another calculator with the fields already filled in.
The calculation report gathers this page's inputs, results, equations, assumptions and references, with fields for project, engineer and revision. The full report also includes the charts and interpretations, in color. In the print dialog, choose Save as PDF.
They are additions to normal time so a worker can attend to personal needs, recover from fatigue and absorb small unavoidable delays. Without them, the standard could only be met by someone working the whole shift nonstop, which is neither possible nor fair. In the example, 18% allowances on a 40 s normal time give a 47.2 s standard time.
Personal needs (5% for men and 7% for women) and basic fatigue (4% for everyone). They apply to any job, even light seated work, and add up to 9% or 11%. The variable items (standing, posture, weight, lighting, heat, attention, noise, mental strain, monotony and tediousness) are added according to the job.
The assembly job has a standing operator (2%), lifts 10 lb parts (1%), needs fine work (2%), has intermittent loud noise (2%), a fairly complex process (1%) and medium monotony (1%): 9% variable plus 9% constant, 18% in total. With a 40 s normal time, the standard time is 47.2 s and a 7.5 h shift yields 572 parts. Allowances take 69 minutes of the shift.
The ILO adds the percentage to normal time: ST = NT × (1 + a). When a company defines rest as a share of the shift, the formula is ST = NT ÷ (1 − a), which gives a larger result. To convert, 18% on normal time equals 15.3% of the workday (0.18 ÷ 1.18). Use the same form in every study in the plant.
No. The ILO manual itself presents it as an example with no regulatory force. In the U.S., there is no federal allowance standard; time standards are often covered by union agreements, and the DOL expects personal, fatigue and delay (PF&D) allowances when piece rates are set under Section 14(c) of the FLSA. Record the percentages used and agree them with your workforce.
Click “Use in the time study”: the page opens with personal needs, fatigue (basic plus variable) and unavoidable delays already filled in. In the example, 5%, 13% and 0%. There you paste the stopwatch readings and the rating to get normal time and the final standard time.
It applies the ILO table item by item, without weighting exposure time over the shift. Heat, noise and manual lifting have their own limits (OSHA noise standard, NIOSH lifting equation, heat stress guidance) and are not solved by an allowance: assess them separately. Paid rest breaks the company already gives should be deducted so the same rest is not counted twice.
Important notice: Indus Metrics tools produce estimates and pre-sizing results from the data you enter and from published engineering methods. They do not replace design, calculations or reports signed by a licensed professional engineer (PE), nor verification against the applicable codes, standards and regulations, such as OSHA rules and the ASME codes. Material and fuel properties vary: check manufacturer data or your own process analyses before deciding. By using this site you agree to the Terms of Use.
© 2026 Indus Metrics. Found an error? Write to contato@seudominio.com.